Concrete Testing

Fresh and hardened concrete tests, from workability on delivery to compressive strength of cubes at specified ages.

Demoulded concrete cubes beside a curing tank
Illustrative image

Overview

Concrete testing confirms that what was specified is what was placed. Cube strength at 7 and 28 days remains the most common acceptance criterion on Indian sites, supported by workability and density checks on fresh concrete.

Testing supports contractors demonstrating compliance, RMC producers controlling their mixes and consultants verifying structural work.

The tests offered in this category are confirmed at enquiry. Contact the laboratory to check availability for your specific requirement.

What the testing involves

  • Receipt of cubes or beams with casting date, grade and identification marks recorded.
  • Curing until the specified test age where samples are delivered early.
  • Measurement and weighing of each specimen before loading.
  • Loading to failure in a compression testing machine at a controlled rate.
  • Reporting of individual and average results against the specified grade.

Typical tests

  • Compressive strength of concrete cubes
  • Slump and workability
  • Density of hardened concrete
  • Water absorption
  • Mix design support
  • Flexural strength of beams

Materials

  • Concrete cubes
  • Concrete beams
  • Fresh concrete samples
  • Concrete mix constituents

Methods and standards

Testing is carried out to the methods required by your project specification. Tell us the applicable standard or contract clause when you enquire and we will confirm it is covered before testing begins.

Typical applications

  • Acceptance testing on building and infrastructure projects
  • Quality control at RMC plants
  • Trial mixes and mix design verification
  • Investigation of disputed or low results

Who uses this service

  • Building contractors
  • RMC producers
  • Government project contractors
  • Structural consultants

What to provide with your request

  • Number of specimens and their identification marks
  • Concrete grade and casting date
  • Test age required (for example 7 or 28 days)
  • Structural element or pour reference
  • Whether curing at the laboratory is needed

Planning concrete testing for your project?

Tell us the material, the project and what the result needs to show. We will confirm the tests, the sample quantity required and the reporting time.

Chat on WhatsApp